Busbar trunking up to 6400 A
We supply, install and maintain busbar trunking systems for hospitals, government and security facilities, factories, hotels, malls and residential developments. Projects across Egypt, from Matrouh to Aswan, with no minimum project size.
- Copper busbars, with bimetal busbars in selected ratings
- IP 55 indoor systems
- Cast-resin IP 68 systems for outdoor and demanding locations
- Tap-off units for local loads along the run

Supply, installation, maintenance
Supply
Busbar trunking systems up to 6400 A.
Installation
Installed by company teams, supervised by company engineers, from offer to handover.
Maintenance
Maintenance and technical support for installed systems after handover.
Key facts
| Feature | Detail |
|---|---|
| Rating range | Up to 6400 A |
| Conductors | Copper busbars (bimetal busbars in selected ratings) |
| Protection degree | IP 55 indoor systems; IP 68 cast-resin and outdoor systems |
| Accessories | Tap-off units (for example 66 tap-off units, 32 A to 250 A, at Ismailia Security Directorate) |
| Scope | Distribution, installation and maintenance |
| Cast resin reference | 1000 A, IP 68, Asala Mall |



What a busway run is made of
A busway system is assembled on site from factory-built sections and accessories.
01 Straight lengths
The standard sections that carry power along the route of the run.
02 Elbows and tees
Change direction and split the run to follow the building layout.
03 End feed units
Connect the run to the switchboard, panel or transformer at each supply point.
04 Tap-off units
Plug-in points that feed local loads along the run. Ismailia Security Directorate uses 66 tap-off units, from 32 A to 250 A.
05 End caps
Close and protect the end of each run.
06 Hangers and supports
Fix the run to the slab or structure along its route.
What we need to prepare an offer
We study the single-line diagram, layout drawings and bill of quantities. Each connection rating, entry position and available space is agreed with the client's consultant for the project.
| Document | What it tells us |
|---|---|
| Single-line diagram | The ratings, sources and loads the system must feed. |
| Layout drawings | The route of the run, entry positions and the space available. |
| Bill of quantities | The quantities the offer is priced on. |
Send your single-line diagram, layout drawings and bill of quantities. Our engineers will review them and prepare a technical and financial offer.
Request a quotationSelected busway projects
| Project | Location | Year | Scope |
|---|---|---|---|
| Strategic Command Centre, Buildings 4, 6 and 8 (Ministry of Defence) | New Administrative Capital | 130 m of 3200 A, 1088 m of 1600 A, 1155 m of 1200 A in each building | |
| Command and Control Building (SOC), Ministry of Interior | New Cairo | 2024 | 4000 A copper; 1600 A, 1000 A, 900 A, 630 A bimetal |
| Ismailia Security Directorate | Ismailia | 2024 | 3200 A, 1600 A, 900 A, 630 A; 66 tap-off units, 32 A to 250 A |
| Alamein Security Directorate | Alamein | 2023 | 5000 A, 4000 A, 3200 A, 2500 A |
| Cairo Security Directorate | Cairo | 2021 | 5000 A, 4000 A, 3200 A, 1600 A, 900 A, 630 A |
| New Security Complex, Ministry of Interior | New Cairo | 2021-2025 | Multiple buildings and two main central A/C stations |
| 10th of Ramadan Correction and Rehabilitation Center | Al-Sharqia | 2023 | Copper busway 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| 15th of May Correction and Rehabilitation Center | Cairo | 2023 | Copper busway 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| New Akhmim Correction and Rehabilitation Center | Sohag | 2023 | Copper busway 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| Badr Correction and Rehabilitation Center | Badr City, Cairo | 2021 | Copper busway 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| Wadi El-Natrun Correction and Rehabilitation Center | Sadat City | 2021 | Copper busway 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| Police Hospital | Nasr City, Cairo | 2025 | IP 55 and IP 68 busway: 5000 A, 2500 A, 2000 A, 1000 A, 800 A |
| Justice City (supervision: Military Works Department) | New Capital | Eight buildings including the Court of Cassation, Supreme Constitutional Court, Family Court, Services Building, Supreme Council, Economic Court, Court of Appeal and Council of State | |
| One Eleven (Azur) | Alamein | 2026 | IP 55 busway: 5000 A, 4000 A, 3200 A, 2000 A, 1600 A |
| N-Square Mall | 5th Settlement, Cairo | 2026 | IP 55 busway, 3200 A |
| Asala Mall | 5th Settlement, Cairo | 2026 | 1000 A IP 55 indoor; 1000 A IP 68 cast resin |
| Huhtamaki Flexibles Egypt | October | 2026 | IP 55 busway, 1000 A |
| Ariston factory | October | 2026 | IP 55 busway, 4000 A |
| Capital Dubai Mall | New Capital | 2025 | Indoor busway, 5000 A |
